About KC Solar Park

SOLAR PARK

As per Renewable Solar Policy 2015 of Govt. of Maharashtra, small investors, Captive consumers who wish to use electricity generated from Solar power projects. And also captive consumers can also develop independent solar park for captive use only. The solar power projects of less than 1 MW capacity may be developed if project is minimum 250 kW capacities each are installed and combined MSEDCL /MSETCL will give grid connectivity to these small projects if their combined capacity becomes 1MW or more. In response to above visionary initiative taken by Govt. Of Maharashtra we are introducing MINI SOLAR PARK for Captive & Small Investors.

Salient features of MINI Solar Park
      Park Capacity – 3 MW
      Gird Connectivity received by MSETCL
      Evucation ready on 33 kV, Evacuation line & 33 kV Bay work at MSETCL 132/33 kV Digras Substation

      Collector approved NA Land with auxiliary power supply & water arrangement.

      As per Simumulation (simulation) study net generation fed to grid for 250 kW is 403412 units per annum.



Operation & Maintenance

KCPIPL provides ongoing operations and maintenance services 25 years long term contract for utility-scale and commercial photovoltaic systems. A diverse team of experts, with access to powerful technology and proprietary monitoring solutions, tracks all performance indicators and parameters to ensure optimized performance.

Monitor all important real-time data 24/7/365

Perform preventive maintenance and repair.

Manage incidents and alerts.

Audit energy production.

Assess, report and achieve maximum ROI.

To ensure continuously optimum performance, we use proprietary software to control and manage our operations.

< <

NASA

METEONORM

 

At Hzl. Surface

At 5° Tilted Surface

At35° Tilted Surface

At20° Tilted Surface

Max. Radiation

At Hzl. Surface

At 20° Tilted Surface

kWh/m2/day

Jan.

4.87

5.18

6.50

6.01

6.50

4.52

5.61

Feb.

5.51

5.73

6.52

6.30

6.52

5.41

6.39

Mar.

6.23

6.31

6.43

6.55

6.55

6.11

6.60

April

6.61

6.52

5.94

6.40

6.52

6.68

6.67

May

6.55

6.45

5.33

6.04

6.45

6.63

6.24

June

5.20

5.21

4.86

5.15

5.21

5.60

5.14

July

4.29

4.28

3.95

4.20

4.28

4.48

4.17

Aug.

4.05

3.97

3.58

3.85

3.97

4.44

4.30

Sept.

4.79

4.78

4.61

4.81

4.81

5.05

5.17

Oct.

5.19

5.33

5.77

5.70

5.77

5.33

6.02

Nov.

4.84

5.11

6.21

5.82

6.21

4.90

5.98

Dec.

4.61

4.78

6.03

5.56

6.03

4.44

5.69

Average

5.22

5.30

5.47

5.53

5.74

5.30

5.66



Salient features of KC Solar Park:
Lowest cost offer for O & M cost.
Combo Plan is available for O & M and Land Lease.

IPP
We are independent power producer and the same we offer to sale utilities and end users.

Power Purchase Agreement (PPA) assistance
For qualifying customers, we can assist to enter in long-term Power Purchase Agreements (PPA) with utilities as well as with open access consumers.

Operation & Maintenance
KCPIPL provides ongoing operations and maintenance services 25 years long term contract for utility-scale and commercial photovoltaic systems. A diverse team of experts, with access to powerful technology and proprietary monitoring solutions, tracks all performance indicators and parameters to ensure optimized performance.
Monitor all important real-time data 24/7/365
Perform preventive maintenance and repair.
Manage incidents and alerts.
Audit energy production.
Assess, report and achieve maximum ROI.
To ensure continuously optimum performance, we use proprietary software to control and manage our operations.

K C SOLAR PARK PARTICULARS


PARK - 1 – Osmanabad, Maharashtra

KC Power develops own 130MW (extendable up to 250 MW ) solar park at Umerga Taluka, Dist – Osmanabad in it the areas included like Madaj, Chirewadi and Vaghdari etc.
The plant location situated nearest National Highway is NH9 i.e. Pune-Hyderabad.
It is located 85 km by road east of the city of Solapur, 95 km by road from the district capital of Osmanabad, and 20 km west of the Karnataka-Maharashtra State boundary.
GHI has a direct impact on electricity generation and the Annual Average Daily solar radiation is 5.29kWh/m²/d.

Features:
Ready to start with concern approvals & facilities park capacity 150 MW Solar Parks each with capacity of 50 MW and above. Evucation available on 132 kV level & 33 kV level.
Eligibility – For 132 kV 10 MW and above for 33 kV 1 to 10 MW.
Land lease for 28 years available.
Capacity of Solar Park – Minimum Capacity – 1 MW Maximum capacity.
Simulation study and counter map available.

Park - 2 - Amravati Park

Park Capacity – 300 MW
Evucation available on 220 kV.
Land Acquisition is in under process & ready to avail benefits within 3 months along with necessary approval & facilities.
Land for outright sale is available.

Park - 3 - Yavatmal Park

Park Capacity – 100 MW
Evucation available on 132 kV.
Land Acquisition is in under process & ready to avail benefits within 3 months along with necessary approval & facilities.
Land for outright sale is available.